New Dragflow Installation in Brindisi Harbor (Italy)

New Dragflow Installation in Brindisi Harbor

Dragflow extends its wide range of products, launching on the market an innovative “booster station”. The new booster pump is proposed together with traditional submersible dredge pumps and it’s perfect for projects that require a very long delivery distance, or to reach a high discharge level.

The booster station has been completely designed, manufactured and tested by Dragflow’s technicians and engineers, that used their consolidated knowhow and the expertise gained working for several years in the company, in order to assure the suitability and functionality of the end product.

The new booster pump has been used for the first time in the months in Brindisi’s Harbour for maintenance and dredging operations: the innovative product’s guaranteed high performance, reaching the required longer delivery distance.

New Dragflow Installation in Brindisi Harbor.

At the beginning, Dragflow supplied for the harbour maintenance a dredger with telescopic boom with the addition of an anti-turbidity bell to capture the sediments and prevent water turbidity. The sea sediments can be polluted by metals, hydrocarbons, bacteria, chemical substances which in most cases are toxic, resilient and accumulate as debris: a digging operation without turbidity limitation of the surrounding waters could cause serious damage to the marine ecosystem.

Afterward, the Brindisi’s harbour maintenance project expanded and Dragflow supplied the new “booster station”, in addition to the submersible dredge pump, in order to reach a higher discharge level. The innovative product, equipped with an automatic lubrication system, can reach the distance of 1,5 km from the dredging point and it guarantees a capacity of 500 m3/h. It can regulate automatically the speed through the different stages of the operations and it’s provided with a remote control that permit the operators to control the booster from dredge cabin. Dragflow’s booster station is powered by diesel engine, but the same it’s available electric motors.

Dredging Today Staff, April 19, 2012; Images: DRAGFLOW

Share this article

Follow Dredging Today

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Advanced Pump and Slurry Course

Pumping slurry is a complex and important process. In this advanced, 4-day training, emphasis is put on the hydraulic transport of solids…

read more >

2015 Port Administration and Legal Issues Seminar

This two-and-one-half day seminar covers the latest trends, challenges and risk management strategies for port administrators, finance…

read more >

Ocean Business 2015 Conference

More than just a static Exhibition Ocean Business already has an outstanding reputation for its training and demonstration programme, which…

read more >

SEDHYD 2015

The Joint Conference will provide Federal and non-Federal scientists and managers from various disciplines the opportunity to discuss…

read more >

Jobs>

Multiple Positions available for dredging project in Malaysia

Hall Contracting has recently been awarded a contract in Johor Bahru, Malaysia. They are currently looking for a Cutter Suction Dredge 1st and 2nd Operator...

apply

Proposal Designer Special Projects

You work together with our salesteam, finding creative solutions to meet customers demands but build effieciently as usual and produce effectively ass well. Je create broad ship designs and adapt it for specific customer demands. Besides, you prepare specifications...

apply

Controller international projects

Project controllers are part of the project team abroad, responsible for setting up, implementing, and managing Finance and Control issues on-site at projects and in our offices all over the world...

apply