EPA Issues Amendment to ROD for Columbus Cleanup (USA)

EPA Issues Amendment to ROD for Columbus Cleanup (file photo)

EPA Region 7 has issued an amendment to the Record of Decision (ROD) for the 10th Street Superfund Site in Columbus, Neb. EPA signed the ROD for the site in February 1995 to address groundwater contamination.

The selected remedy for the 1995 ROD was sampling of municipal and monitoring wells and institutional controls to limit exposure to contamination from the site.

Site activities in 2000 and 2001 led to a final ROD issued in 2005. The final ROD selected the following remedies:

– Continued operation of the Air Sparge/Soil Vapor Extraction and Groundwater Extraction and Treatment (GET) systems;

– In Situ Chemical Oxidation (ISCO) in the upgradient portion of the groundwater contaminant plume;

– Institutional controls in all three source areas.

The new ROD Amendment changes the selected remedy for the soil and groundwater contamination at the 10th Street Site. The selected amended remedy for the contaminated source area soils is building demolition, excavation of soil, and off-site disposal at all three source areas, the former One Hour Martinizing dry cleaner, the former Jackson Services, and the former Liberty Cleaners. The area of the excavated soil will be backfilled with non-contaminated soil.

The selected amended remedy to address contaminated groundwater at the former Jackson Services and former Liberty Cleaners source areas includes continued operation of the GET system and limited ISCO. The selected remedy for the contaminated groundwater at the former One Hour Martinizing dry cleaner is ISCO and/or biological remediation.

The contaminants of concern at the 10th Street Superfund Site are tetrachloroethene (PCE) and tricloroethene (TCE). PCE and TCE are commonly used in dry cleaning operations and also as industrial degreasers. The site was added to the National Priorities List in August 1990.

Press Release, January 7, 2013

Share this article

Follow Dredging Today

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Advanced Pump and Slurry Course

Pumping slurry is a complex and important process. In this advanced, 4-day training, emphasis is put on the hydraulic transport of solids…

read more >

2015 Port Administration and Legal Issues Seminar

This two-and-one-half day seminar covers the latest trends, challenges and risk management strategies for port administrators, finance…

read more >

Ocean Business 2015 Conference

More than just a static Exhibition Ocean Business already has an outstanding reputation for its training and demonstration programme, which…

read more >

SEDHYD 2015

The Joint Conference will provide Federal and non-Federal scientists and managers from various disciplines the opportunity to discuss…

read more >

Jobs>

Proposal Designer Special Projects

You work together with our salesteam, finding creative solutions to meet customers demands but build effieciently as usual and produce effectively ass well. Je create broad ship designs and adapt it for specific customer demands. Besides, you prepare specifications...

apply

Controller international projects

Project controllers are part of the project team abroad, responsible for setting up, implementing, and managing Finance and Control issues on-site at projects and in our offices all over the world...

apply

Multiple Positions available for dredging project in Malaysia

Hall Contracting has recently been awarded a contract in Johor Bahru, Malaysia. They are currently looking for a Cutter Suction Dredge 1st and 2nd Operator...

apply