A necklace of islands mooted for the upper harbour, using 7.2 million cubic metres of spoil dredged from lower Otago Harbour, is gaining … By John Lewis (odt) Source: odt, January 10, 2012;
January 10, 2012 |
Read More »
Prolec Ltd, the Poole UK based manufacturer of electronic safety and productivity monitoring equipment for construction plant, has gained European type approval under the machinery directive for their Liftwatch 5 Rated Capacity Indicator (RCI). “Liftwatch 5 has been the industry’s benchmark RCI since its inception” says Gary Tuffy, Prolec’s Sales and Marketing Director. “We’ve [...]
April 18, 2011 |
Read More »
While the U.S. Army Corps of Engineers dredged the Atlantic Intracoastal Waterway, the Point at Emerald Isle gained beachfront. Sourcecarolinacoastonline:,February 12,2010
February 14, 2010 |
Read More »