News

about 16 years ago

USACE Proposes Maintenance Dredging on Mississippi River (USA)

The maintenace dredging work consists of furnishing one hydraulic pipeline dredge and attendant plant necessary for the removal and satisfactory disposal of shoal material from the lower Mississippi River and Southwest Pass within the limits of work. The estimated time of completion is 135 calendar

1 minutes read

The maintenace dredging work consists of furnishing one hydraulic pipeline dredge and attendant plant necessary for the removal and satisfactory disposal of shoal material from the lower Mississippi River and Southwest Pass within the limits of work.

The estimated time of completion is 135 calendar days.

Estimated price range is between $5 million and $10 million.

[mappress]

Source: fbo.gov, July 1, 2010

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.