DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›UAE: Cutter Suction Dredger CSD 500 Launched at Al Jadaf Dockyard
Vessels

October 23, 2011 · about 15 years ago

UAE: Cutter Suction Dredger CSD 500 Launched at Al Jadaf Dockyard

The launching of Cutter Suction Dredger (CSD 500) took place at Al Jadaf Dockyard, Dubai on Sunday October 16, 2011.The ceremony was conducted in the presence of Mr. Anil Daniel Abraham (CEO) and Mr. M.J. Thomas (CFO) of APT Global Marine Services LLC and Mr.Walter van Wijk, Mr.Danny Nijssen and Mr.

1 minutes read
  • LinkedIn
  • X
  • Email

The launching of Cutter Suction Dredger (CSD 500) took place at Al Jadaf Dockyard, Dubai on Sunday October 16, 2011.The ceremony was conducted in the presence of Mr. Anil Daniel Abraham (CEO) and Mr. M.J. Thomas (CFO) of APT Global Marine Services LLC and Mr.Walter van Wijk, Mr.Danny Nijssen and Mr.Ben Maas of VostaLMG.

VostaLMG and APT Global Marine Services LLC signed the contract for the construction of two identical CSD 500’s (BN 1140 and BN 1141) in May 2011.

The keel laying for both vessels was conducted on the 2nd of June 2011, which makes the total construction time for the first vessel only 4, 5 months until launching!

Both vessels are scheduled to be handed over to the client by November 2011.

The CSD 500 is engineered by VostaLMG and fully constructed by APT Global Marine Services LLC. This is the first vessel built by VostaLMG in the United Arab Emirates.

Vessel Information

Type: CUTTER SUCTION DREDGER 500

Ship Builder: APT Global Marine Services LLC

Length Overall: 38 meters

Breadth over pontoon: 2.75 meters

Dredging Depth: min. 2- / max. 15 meters

Discharge Diameter: 500 mm

Total Installed Power: 1270 Kilowatt

Cutter Power: 175 Kilowatt

Pump Power: 950 Kilowatt

Class: Bureau Veritas

[mappress]

Source: aptglobalmarine, October 24, 2011

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free