News

about 14 years ago

China: Mud Drain Test of Macau 1000CUM Barge Conducted on March 1

The mud drain test of Macau 1000CUM self-propelled split hopper barge was conducted on March 1, following the trial voyage on February 10, 2012. XED is authorized by Macau Entertainment Co. Ltd to conduct complete design (including detailed and workshop design). The barge was built at Zhongshan Weih

1 minutes read

The mud drain test of Macau 1000CUM self-propelled split hopper barge was conducted on March 1, following the trial voyage on February 10, 2012.

XED is authorized by Macau Entertainment Co. Ltd to conduct complete design (including detailed and workshop design).

The barge was built at Zhongshan Weihang Shipyard Co. Ltd., and it serves in Macau coastal area, working together with bucket and grab dredgers to loan and unload sediment and gravel.

Specifications:

LENGTH (O.A.) – 60.80 m

BREADTH (MLD.) – 13.60 m

DEPTH (MLD.) – 5.20 m

M.E. – ZIBO DIESEL ENGINE FACTORY,CHINA,TYPE 6230ZC-1, 2 SETS

M.C.R – 2×660 kW

SERVICE IN COASTAL AREA – MACAU WATERS

[mappress]

Dredging Today Staff, March 12, 2012; Image: xed

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.