News

about 14 years ago

Kenya: Mombasa Port Dredging Nears End

According to allAfrica, the dredging of Mombasa Port is almost completed. The port has now been dredged to minus 15 metres in the inner channel, with a width of 300 metres in the narrowest point. The turning basin, where a large ship can turn around, has also been dredged to a depth of minus 15.0 [&

1 minutes read

According to allAfrica, the dredging of Mombasa Port is almost completed.

The port has now been dredged to minus 15 metres in the inner channel, with a width of 300 metres in the narrowest point.

The turning basin, where a large ship can turn around, has also been dredged to a depth of minus 15.0 metres and widened to 500 metres.

Previously Mombasa Port has only been accommodating ships of around 200 metres long and with around 2,000 TEUs capacity.

Once the dredging has been fully completed in a few weeks time, the port should be able to handle ships with up to 4,500 TEUs capacity.

[mappress]

Dredging Today Staff, April 17, 2012;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.