DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›DAMEN: CSD250 Dredger Delivered to African Customer
Business & Finance

August 10, 2012 · about 14 years ago

DAMEN: CSD250 Dredger Delivered to African Customer

A complete turn key dredging package was delivered to an African customer. The package included a CSD250 dredger with several options, a floating pipe line and a small boat. The complete kit fitted 5 40’ containers. As the order included training and spares as well, the dredger had an excellent star

2 minutes read
  • LinkedIn
  • X
  • Email

A complete turn key dredging package was delivered to an African customer. The package included a CSD250 dredger with several options, a floating pipe line and a small boat.

The complete kit fitted 5 40’ containers. As the order included training and spares as well, the dredger had an excellent start.

The Damen cutter suction dredger, type CSD250, will be used for cleaning irrigation channels. The standard dredger has been fitted out with a sun awning, navigation lights and a light propulsion unit. The dredger will work at max 6 m dredging depth and has a swing width of 22 m. The Damen dredge pump, type BP2320 has a mixture capacity of 1.000 m3/h, using piping with a 250 mm internal diameter. The total installed power is 254 kW, delivered by a Caterpiller C12 diesel engine.

This dredger has been fitted out with a light propulsion unit to enable it to work independently, it can sail without assistance to another jobsite. This independence is also shown by the delivery of a small boat, a simple row-boat with outboard engine enables the dredgers operators to arrive at the dredger each morning. With the dredger a complete spares set was delivered to make sure the operator can keep the dredger in good condition.

The CSD250 dredger weighs 30 tons and fits into 3 40’ open top containers. The floating pipe line, row-boat and spares were delivered in another 2 40’ open top containers. This manageable lot contained the full dredging package – the proof of the practicality of dismountable dredgers.

The crew was trained in the Netherlands in the operation and maintenance of the CSD250. The dredger has been commissioned by Damen field service engineers on location – giving the CSD250 an excellent start.

[mappress]

Dredging Today Staff, August 10, 2012; Image: damen

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dredging underway at Everett Harbor and Snohomish River
  2. 2PD Ports opens new Marine facility
  3. 3PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  4. 4Puerto de Sevilla completes Guadalquivir dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free