Advertisement

Equipment

about 14 years ago

China: Boluomiao Shipyard Completes Repair of “HANG DAO JUN 1”

Recently after the successful repair & conversion of a number of high tech multi-purpose vessels at the Boluomiao shipyard, one large dredger ship named “HANG DAO JUN 1“sailed out at 7:00 AM, Nov. 5th after finishing her survey. In face of the lack of man power and short time limit, daily meeting wa

1 minutes read

Recently after the successful repair & conversion of a number of high tech multi-purpose vessels at the Boluomiao shipyard, one large dredger ship named “HANG DAO JUN 1“sailed out at 7:00 AM, Nov. 5th after finishing her survey.

In face of the lack of man power and short time limit, daily meeting was continuously held at 3:00 PM onboard to collect all the quality and technical problems.

The major jobs of this vessel included 2 sets of main engine maintenance, pumps overhauling, oil separator overhauling, piping renewal, docking survey and some steel work.

[mappress]

Press Release, November 15, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.