News

about 14 years ago

Germany: WSA Announces Elbe Dredging Plans

Wasser- und Schifffahrtsamt Cuxhaven has announced the details about the maintenance dredging works on the Lower and Outer Elbe, at the area KM 638.9 – KM 755.3, from 2013 to 2016. This work will be undertaken by using a suction hopper dredger in the fairway channel and in the wake of the Lower and

1 minutes read

Wasser- und Schifffahrtsamt Cuxhaven has announced the details about the maintenance dredging works on the Lower and Outer Elbe, at the area KM 638.9 – KM 755.3, from 2013 to 2016.

This work will be undertaken by using a suction hopper dredger in the fairway channel and in the wake of the Lower and Outer Elbe, with excavation of 28,000,000m³ of the material.

It is intended, in addition, to award by negotiated procedure:

a) a repeat order to extend the contract by 1 year;

b) six dredging campaigns with a volume of 1,000,000 m3,

c) extension of the width of the fairway channel from 300m to 320m in the case of a legally authorized shipping channel adaptation of the Lower and Outer Elbe for 14.5m draft container ships.

It is assumed that in the first year maintenance dredging will be in the amount of 10,000,000m³ and in the following two years the amount dredged will be 9,000,000m³ per annum.

The deadline for the tender is January 29, 2013.

[mappress]

Dredging Today Staff, December 20, 2012; Image: HHM / M. Lindner

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.