DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›The Netherlands: New Bow Coupling from HollandMT
Business & Finance

January 28, 2013 · about 13 years ago

The Netherlands: New Bow Coupling from HollandMT

Holland Marine Technologies BV has developed a new range of bow-coupling systems for Trailing Suction Hopper Dredgers (TSHD). The bow-coupling system enables a THSD to couple to-, and discharge slurry via a floating dredge pipeline or by means of a rain-bow nozzle (for beach replenishment). The Holl

1 minutes read
  • LinkedIn
  • X
  • Email

Holland Marine Technologies BV has developed a new range of bow-coupling systems for Trailing Suction Hopper Dredgers (TSHD).

The bow-coupling system enables a THSD to couple to-, and discharge slurry via a floating dredge pipeline or by means of a rain-bow nozzle (for beach replenishment).

The HollandMT bow coupling system is fitted with a unique coupling mechanism to the floating dredge pipeline. The coupling mechanism comprises of a click-in ball joint mechanism (male-part) which is locked and released by a single hydraulic cylinder mechanism. This mechanism is designed to perform in rugged operating conditions; any sand or dirt accumulation will not interfere with the locking and releasing mechanism of the male part.

The new range bow couplings has been developed for 500 to 900 mm dredge pipe line. The first order for a 700 mm unit has been awarded to HollandMT and delivery of the bow-coupling unit and winch is scheduled for March 2013.

[mappress]

Press Release, January 28, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free