News

about 13 years ago

VIDEO: “Pat M” at Work in La Guaira (Venezuela)

The backhoe dredger ‘Pat M’ working in La Guaira, Venezuela, loading the split barge Desterro, during works for the port’s new Container Terminal currently under construction. The film was made on 16th February and shows the dredger in action loading the barge, and also a few shots of the revolution

1 minutes read

The backhoe dredger ‘Pat M’ working in La Guaira, Venezuela, loading the split barge Desterro, during works for the port’s new Container Terminal currently under construction.

The film was made on 16th February and shows the dredger in action loading the barge, and also a few shots of the revolutionary dredge software from Foreshore Technology , with the 3D imagery of the dredged area.

‘Pat M’ is working in approximately 11m of water, with a final dredge depth on -18m, so there is approximately 7m of sand, rock and silt to be removed.

[mappress]

Dredging Today Staff, February 20, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.