DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: DMCA Development Project Introduced
Business & Finance

March 30, 2013 · about 13 years ago

USA: DMCA Development Project Introduced

U.S. Army Corps of Engineers has announced a plan for the Dredge Material Containment Area (DMCA) 14B development project, Savannah Harbor, Jasper County. This project includes the raising of the existing perimeter containment dike of the Dredge Material Containment Area (DMCA) 14B. The perimeter di

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers has announced a plan for the Dredge Material Containment Area (DMCA) 14B development project, Savannah Harbor, Jasper County.

This project includes the raising of the existing perimeter containment dike of the Dredge Material Containment Area (DMCA) 14B. The perimeter dike spans a length of 25,000 feet.

The crest of the quote mark front dike, quote mark or the stretch of dike that parallels the Savannah River, is currently at an approximate elevation of 33 feet MLLW. The quote mark back dike, quote mark or stretch of dike that’s opposite the front dike, is currently at elevation 25 feet MLLW.

The cross dikes transition in elevation from 33 to 25 feet MLLW. This project will involve raising the current dike approximately 6 feet in height to an elevation range of 31 to 39 feet MLLW. The construction of the new dike will be on the interior slope of the existing dike. The design also includes a stability berm/counterweight on the inside toe of the new dike from Stations 52+00 to 157+00.

Approximately 760,000 cubic yards (CY) of fill material will be required for the raising. This estimate includes the volume required to fill the template (560,000 CY) and accounts for any settlement or displacement that will occur during or prior to construction (200,000 CY).

Fill material will be obtained from the interior of DMCA 14B.

More info

[mappress]

Source: fbo.gov; March 31, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free