Business & Finance

about 13 years ago

VIDEO: Progress of Panama Canal Expansion Program

The Panama Canal expansion project will double the capacity of the Panama Canal by 2015 by creating a new lane of traffic and allowing more and larger ships to transit. The project is expected to create demand for ports to handle post-Panamax ships. The program also entails the widening and deepenin

1 minutes read

The Panama Canal expansion project will double the capacity of the Panama Canal by 2015 by creating a new lane of traffic and allowing more and larger ships to transit.

The project is expected to create demand for ports to handle post-Panamax ships. The program also entails the widening and deepening of existing navigational channels in Gatun Lake and the deepening of Culebra Cut.

The project will:

– Build two new locks, one each on the Atlantic and Pacific sides. Each will have three chambers with water-saving basins;

– Excavate new channels to the new locks;

– Widen and deepen existing channels;

– Raise Gatun Lake’s maximum operating level.

[mappress]

Dredging Today Staff, July 4, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.