DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Consilium UK to Supply IBS to Port of London Authority
News

July 12, 2013 · about 13 years ago

Consilium UK to Supply IBS to Port of London Authority

Navigation equipment manufacturers Consilium UK announce that they have been appointed to supply the full bridge navigation package to Manor Marine, for the Port of London Authority’s new Mooring Maintenance Vessel currently under build at Portland. Phil Such, of Consilium UK said: “We are delighted

2 minutes read
  • LinkedIn
  • X
  • Email

Navigation equipment manufacturers Consilium UK announce that they have been appointed to supply the full bridge navigation package to Manor Marine, for the Port of London Authority’s new Mooring Maintenance Vessel currently under build at Portland.

Phil Such, of Consilium UK said: “ We are delighted to have been appointed to design and install the navigation equipment for this innovative new vessel, against strong competition among other suppliers. We have enjoyed working with the PLA’s and Manor Marine’s engineers and operational managers, to identify the best equipment needed for the vessel. ”

The package of equipment is required to meet International Shipping regulations for vessels of over 400 Gross Tons and also supports and informs the master in a very wide range of vessel operations, including salvage, crane operations and plough dredging.

The PLA’s Navigation Systems Engineer, Garry Shaw , said: “ My operational and engineering colleagues at the PLA have worked hard to identify the right level and quality of equipment needed for our new ship. We are delighted that Consilium UK has put together such an effective and comprehensive package, which not only includes the system itself but also provides for future support, with optimum operability and availability at affordable through-life costs. ”

The design work for the navigation systems is now underway, to ensure that the package meets all appropriate international radio and Lloyd’s Register regulations.

Construction of the Mooring Maintenance Vessel is proceeding to programme at Manor Marine and the ship is due to commence sea trials in time for its appearance at Seawork 2014.

[mappress]

Press Release, July 12, 2013; Image: pla

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EIB provides EUR100M for Klaipėda Port development
  2. 2South Hayling beach management works on the way
  3. 3DEME opens new Soil Wash installation at Schiphol Airport
  4. 4Lorain Harbor dredging kicks off

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free