Advertisement

Business & Finance

about 13 years ago

USA: Great Lakes Shipyard to Fabricate New Breakwater

Great Lakes Shipyard has been awarded a contract by Whiskey Island Marina to fabricate a new floating breakwater. The Shipyard will fabricate two 150’ long steel cylindrical modules that will be bolted together and anchored in the lake bottom in front of the marina. The project is to be completed by

1 minutes read

Great Lakes Shipyard has been awarded a contract by Whiskey Island Marina to fabricate a new floating breakwater.

The Shipyard will fabricate two 150’ long steel cylindrical modules that will be bolted together and anchored in the lake bottom in front of the marina. The project is to be completed by mid-November.

The 10-foot diameter breakwater is used for wake attenuation to protect the boats and docks in the marina basin from heavy weather and is ballasted to the 6.5’ waterline.

The Shipyard built a similar floating breakwater for Perry’s Landing Marina, Erie PA in 2010. That project involved the assembly of five 40’ x 5’ wide x 8’ sections, ballasted to the 4.5’ waterline.

[mappress]

Press Release, August 27, 2013

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.