DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Repairs to Start on Flood Defences at Snettisham and Heacham (UK)
Business & Finance

December 13, 2013 · about 12 years ago

Repairs to Start on Flood Defences at Snettisham and Heacham (UK)

The Environment Agency has started emergency repairs to the damaged sea defences at Shepherds Port in Snettisham and at Heacham Dam. The defences were damaged last Thursday when the most serious tidal surge for over 60 years washed part of the shingle flood bank away. The shingle bank between the He

1 minutes read
  • LinkedIn
  • X
  • Email

The Environment Agency has started emergency repairs to the damaged sea defences at Shepherds Port in Snettisham and at Heacham Dam.

The defences were damaged last Thursday when the most serious tidal surge for over 60 years washed part of the shingle flood bank away.

The shingle bank between the Heacham North beach and Snettisham has lost significant quantities of material and has a number of holes – the largest being around 8 metres long.

The emergency repairs are vital to protect over 3,000 properties from flooding.

Julie Foley, Area Manager for the Environment Agency , said: “ Our teams have quickly recognised the risk to people and properties in this area and have started emergency repairs on the flood defences as soon as possible.

“We are concentrating on filling the holes in the flood defences and using material from the beach to reinstate the banks where possible.

“Because of the extensive damage to the flood defences, it may not be possible to restore them to the same level of protection as before in the short term.

“We are continuing to work with our partners to recover from the tidal surge and ensure that everyone affected is protected from flooding as much as possible.”

The initial emergency repairs are expected to be completed by Monday 16 December.

[mappress]

Press Release, December 13, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EIB provides EUR100M for Klaipėda Port development
  2. 2South Hayling beach management works on the way
  3. 3DEME opens new Soil Wash installation at Schiphol Airport
  4. 4Lorain Harbor dredging kicks off

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free