DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Saudi Arabia: Jeddah Flood Control Project Moves Ahead
Business & Finance

January 14, 2014 · about 12 years ago

Saudi Arabia: Jeddah Flood Control Project Moves Ahead

Recently, new progress has been made in Section 11 of Flood Control Project of Jeddah, Saudi Arabia. The first blasting was successfully completed, and the first region of downstream foundation trench excavation smoothly passed the client’s acceptance inspection. On the morning of October 31, the pr

2 minutes read
  • LinkedIn
  • X
  • Email

Recently, new progress has been made in Section 11 of Flood Control Project of Jeddah, Saudi Arabia. The first blasting was successfully completed, and the first region of downstream foundation trench excavation smoothly passed the client’s acceptance inspection.

On the morning of October 31, the project department made careful preparation and took safety measures. Along with a “Bang”, a mushroom cloud rose inside the emergency dam spillway of Section 11; in the afternoon, another “bang” sounded inside the new quarry, marking the successful implementation of the first blasting of the whole project, which made a good start for the rock blasting. This blasting is to expand and deepen the emergency dam spillway according to the design section and at the same time, the aggregated rocks from the blasting will be used for dam downstream backfilling after being screened.

On November 7, the first region of emergency dam downstream foundation trench excavation of Section 11 of Flood Control Project of Jeddah, Saudi Arabia smoothly passed the design and consulting engineer’s acceptance inspection. This excavation is the basis for dam heightening and backfilling; all the excavation content is alluvial soil; the excavation amount is 45,000m3. After the principal earthwork excavation was completed, the project department immediately took innovative technology to clean the surface of rocks, which satisfying the client and consulting engineer.

The backfilling work will be conducted next, and its technological requirements are strict and construction difficulty is large. The project department will make full use of the existing resources to overcome the difficulties and complete the project on time with quality guaranteed.

[mappress]

Press Release, January 15, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free