Advertisement

Business & Finance

about 12 years ago

Uljanik to Build Dredger for IHC Merwede

On February 28, 2014, IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger. The installed power of the vessel will correspond to 23,684 kW, the length of the vessel will be 152 m and the width 28 m. The

1 minutes read

O n February 28, 2014 , IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger .

The installed power of the vessel will correspond to 23,684 kW, the length of the vessel will be 152 m and the width 28 m.

The delivery of the vessel is scheduled for April 2016 and same will be constructed in Uljanik Brodogradilište d.d.

[mappress]

March 4, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.