Draft Feasibility Report on Wisner Project Available for Review (USA)

Draft Feasibility Report on Wisner Project Available for Review

A draft feasibility report and environmental assessment for stream bank restoration southwest of Wisner, Neb. is currently available for public review.

The report identifies alternatives to provide stream bank protection and prohibit further rapid erosion on the right-descending bank of the Elkhorn River, Cuming County, Neb. Public infrastructure being protected includes the Cuming County Road 6 bridge and roadway.

β€œThe draft feasibility study report and environmental assessment is the result of a comprehensive study conducted by the Corps in cooperation with Cuming County,” said Gwyn Jarrett, project manager. β€œThe study was carried out under Section 14 of the Flood Control Act of 1946, as amended.”

[mappress]

Press Release, March 12, 2014