Advertisement

Business & Finance

about 12 years ago

Corps Prepares Mystic River Dredging Project (USA)

According to the U.S. Army Corps of Engineers, New England District, the Mystic River dredging project will cost between $5 mln and $10 mln. This cleanup program, located in Groton and Stonington, Connecticut, will last from four to six months. Approximately 250,000 cubic yards of material will be d

1 minutes read

According to the U.S. Army Corps of Engineers, New England District, the Mystic River dredging project will cost between $5 mln and $10 mln.

This cleanup program, located in Groton and Stonington, Connecticut, will last from four to six months.

Approximately 250,000 cubic yards of material will be dredged and placed at the New London Disposal Site (NLDS) in Long Island Sound or the Rhode Island Sound Disposal Site (RISDS) in Rhode Island Sound.

The solicitation is planned to be issued in June 2014.

More info

[mappress]

Advertisement

Source: fbo.gov, March 26, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.