DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Another Damen’s Dredger Arrives in Nigeria
Business & Finance

May 19, 2014 · about 12 years ago

Another Damen’s Dredger Arrives in Nigeria

A Damen CSD500 has been delivered to Nigeria. The stationary dredger has been assembled on the beach and pushed and tugged into the sea over a ramp. The cutter suction dredger will perform maintenance duties in and around the harbours of Port Harcourt. As all Damen cutter suction dredgers are dismou

1 minutes read
  • LinkedIn
  • X
  • Email

A Damen CSD500 has been delivered to Nigeria. The stationary dredger has been assembled on the beach and pushed and tugged into the sea over a ramp. The cutter suction dredger will perform maintenance duties in and around the harbours of Port Harcourt.

As all Damen cutter suction dredgers are dismountable and their transport is straightforward. The various elements such as the pontoons and control cabin were hoisted from the transport ship onto trucks. These trucks were unloaded on a Nigerian beach for dredger assembly on the spot.

The crew together with a Damen field service engineer assembled the cutter suction dredger using hoisting gear available locally.

With the main pontoon placed on a wooden ramp, once assembled the dredger was pushed into the sea by 2 bulldozers assisted by a tug pulling the other end. The dredge design allows for this type of launching to make sure it can be deployed anywhere.

The CSD500 will perform maintenance duties at a dredging depth of -16 m in the wider Port Harcourt area. The dredge pump has a mixture capacity of 4.000 m3/h. The dredging project started immediately.

[mappress]

Press Release, May 19, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  2. 2Puerto de Sevilla completes Guadalquivir dredging
  3. 3McLaughlin & Harvey appointed to Dover' Project Contractor Framework
  4. 4Oceanside Harbor dredging wraps up

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free