Advertisement

Business & Finance

about 12 years ago

PHOTO UPDATE: Keel Laying of Easydredge 2700

The keel-laying ceremony for the state-of-the-art IHC Easydredge 2700 ™ took place at MTG Dolphin’s shipyard in Varna, Bulgaria, on August 18th, 2014. The ship, ordered by Royal IHC, is being built under building number BN BN1001 and will be delivered in the summer of 2015. The new vessel will be su

1 minutes read

The keel-laying ceremony for the state-of-the-art IHC Easydredge 2700 ™ took place at MTG Dolphin’s shipyard in Varna, Bulgaria, on August 18th, 2014.

The ship, ordered by Royal IHC, is being built under building number BN BN1001 and will be delivered in the summer of 2015.

The new vessel will be supplied with a “world-dredging package”, which includes bottom doors, a bow coupling and a dredging depth of 25m.

Additional information EasydredgeTM 2700

Type: Trailing suction hopper dredger; Length overall: 81.75m; Breadth: 15.8m; Depth: 5.9m; Draught at international freeboard: 4.4m; Draught at dredging mark: 5.5m; Speed: 11.5 knots; Dredging depth: 25m; Suction pipe diameter: 700mm; Loading capacity: 3,910 tonnes; Hopper capacity: 2,700m3; Daytime accommodation: 8 people.

[mappress]

Advertisement

September 1, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.