Business & Finance

about 12 years ago

New Quay Wall for Limbe Shipyard

BAM International, the operating company of Royal BAM Group active outside of Europe, has completed the quay wall for Cameroon Shipyard and Industrial Engineering Ltd (CNIC) at Limbe. The first 150 metres were already completed in July, which CNIC started using immediately. Now that the last 170 met

1 minutes read

BAM International, the operating company of Royal BAM Group active outside of Europe, has completed the quay wall for Cameroon Shipyard and Industrial Engineering Ltd (CNIC) at Limbe.

The first 150 metres were already completed in July, which CNIC started using immediately. Now that the last 170 metres have been finished, Limbe Shipyard is fully operational as of 1 November, which gives the region’s economy a huge boost.

The design and construct contract had a value of €29 million. The shipyard is situated 80 kilometres north of Douala, Cameroon’s main commercial city.

The 320-metres long quay wall consists of an underwater concrete foundation with 55-tonne blocks on top. In a water depth of twelve to eighteen metres a total number of 1,369 blocks have been installed.

Sister company BAM Infraconsult was responsible for the design of the quay wall.

[mappress mapid=”19158″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.