Advertisement

Business & Finance

about 12 years ago

Dredging Works Continue at Port of Wells

During the next week starting from November 24th 2014, the Port of Wells dredger “Kari Hege” will be engaged in dredging operations in the access channel at the Outer Harbor. Dredger “Kari Hege” will operate from Monday to Friday. Its normal area of work is in the main channel between buoy number 12

1 minutes read

During the next week starting from November 24th 2014, the Port of Wells dredger “Kari Hege” will be engaged in dredging operations in the access channel at the Outer Harbor.

Dredger “Kari Hege” will operate from Monday to Friday. Its normal area of work is in the main channel between buoy number 12 and buoy number 1. The vessel will works during the low water period, starting three hours after high water until three hours prior to the next high water.

The “Kari Hege” will maneuver into its dig position, or back to its mooring, approximately half an hour before or after this time. Any larger vessels intending to pass the “Kari Hege” in the channel during digging operations or while it is maneuvering should call the dredger up on Channel 12 to ascertain which is the safe side to pass.

All material removed from the channel during dredging operation is placed on the berm which is marked by the Port hand channel buoys. Areas to be dredged are dictated by regular survey results but these areas are subject to weather constraints.

[mappress mapid=”19321″]

Press Release

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.