DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Snake River Dredging Starts Next Week
Business & Finance

January 7, 2015 · about 11 years ago

Snake River Dredging Starts Next Week

The U.S. Army Corps of Engineers, Walla Walla District, and its dredging contractor American Construction Company plan to begin lower Snake River dredging on or about Monday, January 12, at the downstream lock approach of Ice Harbor Dam, plus at the confluence of the Snake-Clearwater rivers in the L

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Walla Walla District, and its dredging contractor American Construction Company plan to begin lower Snake River dredging on or about Monday, January 12, at the downstream lock approach of Ice Harbor Dam, plus at the confluence of the Snake-Clearwater rivers in the Lewiston-Clarkston area.

Dredging vessels and equipment will also be moving between the dredging locations and the dredged material placement site (River Mile 116) during this time. The dredging is likely to involve a 24-hour-a-day operation.

Starting today, prior to the start of dredging, the contractor will be placing water quality monitoring buoys both downstream and upstream at the dredging locations. Monitoring buoys measure water turbidity levels.

River mariners are urged to be cautious around dredging vessels and equipment. In accordance with standard procedures, the Corps has also issued a notice to the navigation industry announcing the presence of dredging vessels and equipment in the lower Snake River between today and February 28.

Vessels planning to lock through Ice Harbor Dam during this time period must coordinate in advance of lockage with the Ice Harbor Control Room at (509) 543-3231 or navigation channel 14. This allows the contractor to move dredging vessels or equipment to accommodate vessel lockage.

The Ice Harbor lock is planned to return to normal operations by 5 p.m. on Thursday, January 15.

Maintenance dredging last occurred in the lower Snake River navigation channel in the winter of 2005-2006. Sediment accumulation has since encroached on certain areas of the federal navigation channel and related port berthing areas.

[mappress mapid=”19663″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free