Advertisement

Business & Finance

about 11 years ago

VIDEO: Mystic River FNP Dredging

Mystic River Federal Navigation Project in Groton and Stonington, Conn., is being performed by Cashman Dredging and Marine Contracting Company, LLC, of Quincy, Mass. The Mystic River FNP consists of: a 15-foot channel, 125 feet from the Sound up to the railroad bridge, then 100 feet wide up to highw

1 minutes read

Mystic River Federal Navigation Project in Groton and Stonington, Conn., is being performed by Cashman Dredging and Marine Contracting Company, LLC, of Quincy, Mass.

The Mystic River FNP consists of: a 15-foot channel, 125 feet from the Sound up to the railroad bridge, then 100 feet wide up to highway bridge (U.S. Route 1); a 12-foot channel above the highway bridge to the upper wharves at the Seaport Museum; a 9-foot by 8.5-acre anchorage in the harbor north of Mason Island; and a 9-foot turning basin above the railroad bridge.

Cashman began work on the project in November last year and it will take about five months to complete the works.

A mechanical dredge using various types of clamshell buckets will remove approximately 250,000 cubic yards of material from the Mystic River Federal navigation project, restoring the channels and anchorage area to their authorized depths.

[mappress mapid=”19793″]

Dredging Today Staff

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.