DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Era for Barbours Cut
Business & Finance

May 7, 2015 · about 11 years ago

New Era for Barbours Cut

Four new Super Post-Panamax wharf cranes that are part of a significant upgrade of the Barbours Cut Container Terminal arrived yesterday at the Port of Houston. The cranes, largest ever built by Konecranes, come as a part of the Port Authority overall plan to undertake significant infrastructure imp

1 minutes read
  • LinkedIn
  • X
  • Email

Four new Super Post-Panamax wharf cranes that are part of a significant upgrade of the Barbours Cut Container Terminal arrived yesterday at the Port of Houston.

The cranes, largest ever built by Konecranes, come as a part of the Port Authority overall plan to undertake significant infrastructure improvements, including dredging of the PHA’s Bayport and Barbours Cut channels.

These capital improvement projects will ensure that the Port of Houston can accommodate the advent of larger vessels and increased cargo resulting from the pending Panama Canal expansion in 2016.

Considered as a single project, the dredging of the two channels will cost around $130-150 million and, once completed, will widen and deepen the two critical waterways to allow for larger vessels to call on.

Located on the northern tip of Galveston Bay, Barbours Cut is a 1.3-mile, 300-foot wide, 40-foot deep channel constructed in the 1970s. Thanks to the dredging, the depth of the Barbours Cut berthing area will be increased to 45 feet and shifted 75 feet to the north.

[mappress mapid=”20438″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentProject & TendersTechnology

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Kazakhstan, Jan De Nul discusses cooperation perspectives, spotlight on dredging
  2. 2Greatham North East flood alleviation scheme gets OK
  3. 3Gator Dredging nabs Banana River dredging deal
  4. 4EXCLUSIVE: Doca dos Bacalhoeiros dredging kicks off

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free