DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Woolgoolga Flood Management Plan on Exhibition
Business & Finance

August 13, 2015 · about 11 years ago

Woolgoolga Flood Management Plan on Exhibition

A draft plan aimed at reducing the risk of flooding and flood damage in Woolgoolga and its surrounds is going out for public comment from September 2 until October 12, 2015. The Draft Woolgoolga Floodplain Risk Management Study and Plan follows the completion of a Flood Study for Woolgoolga in 2012,

1 minutes read
  • LinkedIn
  • X
  • Email

A draft plan aimed at reducing the risk of flooding and flood damage in Woolgoolga and its surrounds is going out for public comment from September 2 until October 12, 2015.

The Draft Woolgoolga Floodplain Risk Management Study and Plan follows the completion of a Flood Study for Woolgoolga in 2012, which produced comprehensive flood modelling data.

Last year, a series of community consultation activities were undertaken – including a questionnaire and public meetings – to seek local information on flood experiences from property-owners, residents and businesses. Locals’ views on future levels of development control were also sought.

The Draft Floodplain Risk Management Study and Plan has used the modelling and mapping from the 2012 study and the information provided through the consultation as the basis for investigating the impacts of flooding and possible flood mitigation options.

Some of the mitigation options considered in the Draft Plan include:

· Building levees; · Creating a flood detention area in an existing wetland; · Building a breakwater to provide a permanent open entrance to Woolgoolga Lake; · Improvements to drainage; · Voluntary property raising; · Flood-proofing of properties; · Education programmes; and · Planning and development controls.

Following the public consultation period, a revised final draft will be put before Council for adoption. Once adopted, Council will then be able to seek funds for the mitigation projects.

[mappress mapid=”20974″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEvents

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Turkey launches its first locally designed TSHD
  2. 2Walsh Services wins $39.3M Fairport Harbor dredging contract
  3. 3Canal & River Trust: Gloucester Docks dredging budget doubled
  4. 4USACE completes Lorain Harbor dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free