DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›San Lorenzo River Flood Control Project Starts
Business & Finance

December 15, 2015 · about 10 years ago

San Lorenzo River Flood Control Project Starts

The City of Santa Cruz, CA is scheduled to begin a second sediment disking in the San Lorenzo River Flood Control Project between the Highway 1 and Water Street bridges today. This work is intended to improve the flood carrying capacity of the river in anticipation of predicted extreme winter storms

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Santa Cruz, CA is scheduled to begin a second sediment disking in the San Lorenzo River Flood Control Project between the Highway 1 and Water Street bridges today.

This work is intended to improve the flood carrying capacity of the river in anticipation of predicted extreme winter storms.

The scheme, approved by the California Department of Fish and Wildlife, is expected to continue through Friday, December 18, from 7 a.m. to 5 p.m. daily.

The City performs a wide variety of flood control maintenance activities annually. One of these activities is the disking of the San Lorenzo River bottom between the Highway 1 and Water Street bridges.

This was undertaken in September 2015, however, given the continuing predictions of potentially intense winter El Niño storms, the City has planned a second disking with a deeper grab to better loosen the sediment and allow a greater volume of sediment to be transported through the area during any potential storm events.

The current levees, according to a 2014 U.S. Army Corps of Engineers report, can handle a projected 100 year storm, however, it is not possible to predict water events from an El Niño storm. Given uncertainty in the current storm predictions, it was considered prudent to add this additional level of protection.

[mappress mapid=”21693″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Willapa Harbor dredging underway
  2. 2Dredging begins on Gugu River in Pampanga
  3. 3Boskalis Nederland: Work on Fish Migration River Afsluitdijk in full swing
  4. 4New sand arrives at West Beach and Henley Beach South

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free