Business & Finance

about 11 years ago

Haverhill Local Protection Project up for Comment

The U.S. Army Corps of Engineers, New England District, has prepared a Finding of No Significant Impact, and is reviewing plans to allow the construction of a 600-foot long boardwalk on the Haverhill Local Protection Project. The 600-foot section will extend from the proposed Harbor Place Developmen

1 minutes read

The U.S. Army Corps of Engineers, New England District, has prepared a Finding of No Significant Impact, and is reviewing plans to allow the construction of a 600-foot long boardwalk on the Haverhill Local Protection Project.

The 600-foot section will extend from the proposed Harbor Place Development to an existing boardwalk behind Haverhill Bank. The boardwalk is proposed to be 16 feet wide and will be partially constructed on the floodwall which will support the boardwalk’s southern edge and will be further supported by columns along the boardwalk’s northern edge.

Once completed, this section will be part of an approximately 1,200-foot long continuous section of boardwalk located directly along the northern bank of the Merrimack River at Wall Street.

Public comments on the Corps review and environmental documents can be submitted by January 15, 2016.

[mappress mapid=”21709″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.