Advertisement

Business & Finance

about 10 years ago

TSHD Inai Kenanga Electrical Installations Completed

Bakker Sliedrecht has just completed the electrical installations works on the trailing suction hopper dredger Inai Kenanga. The Inai Kenanga is the biggest TSHD in Malaysia and the world’s third biggest. Bakker Sliedrecht has been responsible for all main electrical installations of the vessel, inc

1 minutes read

Bakker Sliedrecht has just completed the electrical installations works on the trailing suction hopper dredger Inai Kenanga.

The Inai Kenanga is the biggest TSHD in Malaysia and the world’s third biggest.

Bakker Sliedrecht has been responsible for all main electrical installations of the vessel, including the dredging automation system.

This system allows the operators to accurately control the movements of the suction pipe. It also offers the operators real-time productivity information to monitor the dredging process.

The Sliedrecht-based provider of the construction and maintenance of electrical and mechanical installations has equipped the Inia Kenanga with six low voltage drive systems, including two jet pump drive systems, and two drive systems for the suction pipe.

BIMAC, the purpose-built vessel management system that is designed by Bakker Sliedrecht, was also installed on the Inai Kenanga.

Advertisement

The 33,335 m2 TSHD was built at the shipyard of Selat Melaka in Malaysia.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.