DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Another Milestone for Liverpool2 Container Terminal
Business & Finance

May 3, 2016 · about 10 years ago

Another Milestone for Liverpool2 Container Terminal

The first six cantilever rail-mounted gantry (CRMG) cranes arrived in the River Mersey on Sunday, 1 May, ready for installing and commissioning at the Liverpool2 deep-water container terminal. Produced by leading Chinese manufacturer ZPMC, which also supplied the five ship-to-shore cranes already on

1 minutes read
  • LinkedIn
  • X
  • Email

The first six cantilever rail-mounted gantry (CRMG) cranes arrived in the River Mersey on Sunday, 1 May, ready for installing and commissioning at the Liverpool2 deep-water container terminal.

Produced by leading Chinese manufacturer ZPMC, which also supplied the five ship-to-shore cranes already on site, these six are the first of 12 required for phase 1 of the terminal. Ultimately the site will have eight STS and 22 CRMG cranes as part of a £100m investment.

The Liverpool2 development is part of a £650 million investment by Peel Ports in the region and will add to a previous £125 million investment in the National Import Centre at Port Salford.

The project is an extension to the Seaforth Dock container terminal, built by Peel Ports, that is scheduled to be operational in 2016. The terminal extension will be able to accommodate two post-Panamax vessels simultaneously.

The terminal is being built on reclaimed land using material dredged from the River Mersey.

Liverpool2 is to have a phased opening, with marine trials due to begin shortly and other elements of the semi-automated terminal coming online throughout Q2 of 2016. The first phase of the new terminal will be fully operational in the autumn.

[mappress mapid=”22299″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free