DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Design Plans Released for Kennedy Point Marina
Business & Finance

May 26, 2016 · about 10 years ago

Design Plans Released for Kennedy Point Marina

Kennedy Point Boatharbour Limited has released preliminary conceptual design plans for an approximately 200-berth marina proposed to be built at Kennedy Point in Putiki Bay, on the south-west side of Waiheke Island. A New Zealand marina developer Tony Mair and an expert team of specialist consultant

1 minutes read
  • LinkedIn
  • X
  • Email

Kennedy Point Boatharbour Limited has released preliminary conceptual design plans for an approximately 200-berth marina proposed to be built at Kennedy Point in Putiki Bay, on the south-west side of Waiheke Island.

A New Zealand marina developer Tony Mair and an expert team of specialist consultants are conferring with interested parties on the concept designs and preparing an application for resource consent.

“The plans have been developed to minimize the impact to the proposed site and to offer benefits to the Waiheke Boating community ,” Mair said.

The marina will be located adjacent to the existing rock breakwater, which currently protects commercial vehicular ferries. The site has already been modified with marine structures and commercial developments.

All materials for the project – including the rock for the breakwaters, the floating marina piers and piles, and concrete car park pontoons – will be brought in by barge to minimize noise and local disruptions.

The marina office, storage, visitor facilities and proposed clubrooms will also be floating, a technique that has already been successfully utilized at sites such as Orakei Marina in Okahu Bay.

[mappress mapid=”22439″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Port of Tauranga: Stella Passage development faces appeals
  2. 2Dredging on Everett Harbor and Snohomish River begins soon
  3. 3Dravo wins Gioia Tauro dredging contract
  4. 4Aktau Port dredging kicks off

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free