Business & Finance

about 10 years ago

More Dredging Work at Causeway Bay Typhoon Shelter

With immediate effect and for a period of approximately 10 months, marine works involving dredging operations, removal of breakwater and piling works will be carried out inside Causeway Bay Typhoon Shelter. The works will be carried out by a flotilla of vessels including one grab dredger, two hopper

1 minutes read

With immediate effect and for a period of approximately 10 months, marine works involving dredging operations, removal of breakwater and piling works will be carried out inside Causeway Bay Typhoon Shelter.

The works will be carried out by a flotilla of vessels including one grab dredger, two hopper barges, two derrick barges and three tugboats, according to the Hong Kong Marine Department (MARDEP).

The number of vessels engaged in the works will change from time to time to suit operational requirements.

A working area of approximately 30 meters around the dredger and each barge will be established.

A silt curtain, extending from the sea surface to the seabed, will also be established within the works area, MARDEP said.

[mappress mapid=”22644″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.