Advertisement

Business & Finance

about 10 years ago

Another Successful Application of Damen DOP150

At the Port of Corinto, on Nicaragua’s Pacific Coast, a DOP Submersible Dredge Pump 150 has started on a capital dredging project. The municipality of Corinto has decided to build a wave barrier that will protect the town against the wave intrusion. The delivered DOP150 is equipped with a cutter uni

1 minutes read

At the Port of Corinto, on Nicaragua’s Pacific Coast, a DOP Submersible Dredge Pump 150 has started on a capital dredging project.

The municipality of Corinto has decided to build a wave barrier that will protect the town against the wave intrusion.

The delivered DOP150 is equipped with a cutter unit, and has been attached to a crane. The DOP will mine sand near shore, to a max dredging depth of 6 m.

The dredged mixture will be pumped into geotubes that will create an artificial lagoon.

Damen delivered a turn key dredging package enabling immediate start up on location. This package includes the DOP150 with cutter unit, hydraulic hoses, as well as discharge piping for the dredged mixture.

[mappress mapid=”22930″]

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.