Van Oord Wins Two Contracts in Egypt

Van Oord has been awarded two contracts by international contractor Subsea 7 for the construction of a landfall and the execution of subsea rock installation works in Egypt.

The projects are part of the West Nile Delta project, which comprises the development of a series of gas fields, located 65 km off the northern coast of Egypt.

The landfall scope of work consists of the installation of a cofferdam, trenching and pipe pull activities and will be executed in 2017. The landfall location is at the Burrulus terminal near Idku, 50 km from Alexandria.

Van Oord will deploy a trailing suction hopper dredger, backhoe dredger and 600 tonnes winch. Flexible fallpipe vessel Stornes will be deployed this year to execute rock installation activities to prevent upheaval buckling.

Preparations on site have already started.