DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Maintenance Dredging Project Moves Forward at Port of Cape Town
Business & Finance

March 29, 2017 · about 9 years ago

Maintenance Dredging Project Moves Forward at Port of Cape Town

Transnet National Ports Authority’s (TNPA) Dredging Services division has embarked on a $1.1 million maintenance dredging campaign at the Port of Cape Town to restore the design depths inside Duncan dock. The maintenance dredging program, which began on 8 March 2017, is scheduled for completion by t

2 minutes read
  • LinkedIn
  • X
  • Email

Transnet National Ports Authority’s (TNPA) Dredging Services division has embarked on a $1.1 million maintenance dredging campaign at the Port of Cape Town to restore the design depths inside Duncan dock.

The maintenance dredging program, which began on 8 March 2017, is scheduled for completion by the end April 2017.

The main objective of the dredging campaign is to ensure the Port of Cape Town provides safe navigational channels and berthing facilities for shipping by restoring the original design depths, TNPA said.

Two dredging vessels, the trailing suction hopper dredger Isandlwana and the grab hopper dredger Italeni have been mobilized by TNPA Dredging Services for this purpose.

Multi-beam bathymetric surveys are conducted at regular intervals throughout the campaign that will ensure all areas within Duncan Dock are restored to their original design depths.

With 4.200m³ hopper capacity, Isandlwana will remove approximately 70.000 m³ of material from the sea bed before the end of April. Spoil is pumped into the hopper and can be offloaded by discharging through 10 conical bottom valves, the company said.

Pumping ashore is also possible by means of either a floating pipeline, a side discharge mechanism or by ‘rainbowing’, where the dredging vessel discharges material that has been claimed from the ocean floor in a high arc to build a land mass elsewhere, such as during nourishment of beaches, to prevent erosion along the coasts or to reclaim land.

TNPA’s fleet renewal program has boosted the dredging division’s capacity to aid the removal of approximately four million cubic meters of excess material from the seabed every year at South Africa’s ports, the company said.

[mappress mapid=”23828″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Essar secures LoA for Tuna Tekra terminal in Gujarat
  2. 2China to adjust export control measures on dredger-related items
  3. 3PHOTO OF THE DAY: NMDC Group's new dredger Abu Al Bakhoush
  4. 4Helping restore Banana River Lagoon (VIDEO)

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free