DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bakker Sliedrecht to Extend Lifetime of CSD Huta 4
Business & Finance

April 10, 2017 · about 9 years ago

Bakker Sliedrecht to Extend Lifetime of CSD Huta 4

Saudi Arabia’s dredging operator, Huta Marine recently awarded Dutch system integrator Bakker Sliedrecht with a lifetime extension project for the electrical installation of the CSD Huta 4. According to Bakker Sliedrecht, the aim of the project is to extend the lifetime of the 36-year-old cutter suc

1 minutes read
  • LinkedIn
  • X
  • Email

Saudi Arabia’s dredging operator, Huta Marine recently awarded Dutch system integrator Bakker Sliedrecht with a lifetime extension project for the electrical installation of the CSD Huta 4.

According to Bakker Sliedrecht, the aim of the project is to extend the lifetime of the 36-year-old cutter suction dredger with 15 years while increasing the efficiency of production.

The company will be responsible for all main electrical installations during this lifetime extension project. The installations will be designed and assembled at Bakker Sliedrecht’s workshop in Sliedrecht with the commissioning to be taken by the company in Saudi Arabia.

Key installations that are being replaced or upgraded during this project are:

During this lifetime extension project, Bakker Sliedrecht is also improving the production efficiency of the Huta 4. The existing analog controls are being replaced by new digital controls, increasing the accuracy of operators. Moreover, the new controls are maintenance free, which will lower the operational maintenance costs for Huta.

As spare parts of the existing dredging controls are no longer available, Bakker Sliedrecht will also deliver a new dredging control desk with renewed dredging automation.The replaced dredging automation system allows the operators to control the movements of the cutter more accurately. It also offers the operators real-time productivity information to monitor the dredging process.

The lifetime extension of the Huta 4 is scheduled for delivery second quarter of 2018.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul's Galileo Galilei completes São Francisco do Sul dredging
  2. 2Crewing a dredger: Why dredge masters and TSHD engineers are the hardest seats to fill
  3. 3PHOTO OF THE DAY: Spotlight on Damen electric CSD AMORIS
  4. 4FRPD, Van Oord keep Fraser River navigable

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free