Advertisement

Business & Finance

about 9 years ago

Preparations Underway for San Luis Rey River Dredging

The U.S. Army Corps of Engineers, Los Angeles District, will soon begin the sediment removal project in the San Luis Rey River. “Due to the amount of material to be removed, heavy construction equipment and dump trucks will be running continuously for 10 hours a day, 6 days a week. The San Luis Rey

1 minutes read

The U.S. Army Corps of Engineers, Los Angeles District, will soon begin the sediment removal project in the San Luis Rey River.

“Due to the amount of material to be removed, heavy construction equipment and dump trucks will be running continuously for 10 hours a day, 6 days a week. The San Luis Rey Bike Trail will be completely closed during the project (approx. September 5 – March 31) from Foussat Road to Douglas Drive,” said USACE in its announcement.

Apart from dredging, some 150,000 cubic yards of beach compatible sand will be transported onto the beach between Seagaze and Pine Streets.

Non beach compatible sand will be transported to the El Corazon Waste Facility, USACE said.

The plan comes as a part of the overall San Luis Rey Flood Control Project in San Diego County, which was developed by USACE and the City of Oceanside.

[mappress mapid=”24382″]

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.