DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cryonorm Bags TSHD Samuel de Champlain Deal
Business & Finance

December 17, 2017 · about 8 years ago

Cryonorm Bags TSHD Samuel de Champlain Deal

Cryonorm Systems BV has signed a contract with Damen Shiprepair Dunkirk to supply the LNG Fuel System on-board the 8.500m³ trailing suction hopper dredger (TSHD) Samuel de Champlain. Last week, Damen won a contract from Rouen-based GIE Dragages-Ports to undertake the conversion of the dredger to dua

1 minutes read
  • LinkedIn
  • X
  • Email

Cryonorm Systems BV has signed a contract with Damen Shiprepair Dunkirk to supply the LNG Fuel System on-board the 8.500m³ trailing suction hopper dredger (TSHD) Samuel de Champlain.

Last week, Damen won a contract from Rouen-based GIE Dragages-Ports to undertake the conversion of the dredger to dual-fuel capability combining LNG and MGO. The works will take place next year at Damen Shiprepair Dunkerque.

The conversion, the first one of its kind to take place in Europe, is part of an EU-supported initiative to promote LNG propulsion in short-sea vessels operating along the European Atlantic coast.

Cryonorm, the Alphen aan den Rijn based company, will engineer, produce and supply the LNG Fuel Systems.

This job consists of fully shop pre-fabricated dual 170m³ gross LNG tank system each having its own tank connection space, holding all required gas handling equipment, port and starboard side bunker stations and the control system.

The conversion operation itself will last three and a half months.

[mappress mapid=”24692″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free