DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Klaipeda: Removing Contaminated Sediment with Damen DOP350
Business & Finance

January 18, 2018 · about 8 years ago

Klaipeda: Removing Contaminated Sediment with Damen DOP350

A Damen submersible dredge pump, type DOP350, was recently delivered to the Finnish contractor Vesirakennus Ojanen Oy for a work in the Port of Klaipeda, Lithuania. “The DOP pump has been fitted out with a reinforced heavy duty leveler head making it the perfect tool for unloading barges. The head i

1 minutes read
  • LinkedIn
  • X
  • Email

A Damen submersible dredge pump, type DOP350, was recently delivered to the Finnish contractor Vesirakennus Ojanen Oy for a work in the Port of Klaipeda, Lithuania.

“ The DOP pump has been fitted out with a reinforced heavy duty leveler head making it the perfect tool for unloading barges. The head is fitted out with high pressure jet water nozzles, which fluidize the cargo and clean the hopper walls in the process ,” Damen said in their announcement.

The DOP350 was mounted onto a Hitachi excavator; both the hydraulic hoses as well as the dredge mixture discharge hose and the jet water hoses are connected to the boom. The diesel-hydraulic power pack was mounted at the back of the excavator – thus forming a compact dredging system.

The job includes emptying a continuous cycle of hopper barges – filled with contaminated sediment. The environmentally sensitive material is being pumped over a total discharge distance of 1 km.

It is expected that this work will be completed by the end of 2018.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port
  2. 2Precision dredging at Newton Ferrers by TMS
  3. 3Two months to go: get your ticket for OEEC 2026
  4. 4PHOTO OF THE DAY: Dredge Potter returns for 2026 dredging season

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free