DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›VBA Begins Work on £13.3 Million Trent Flood Defenses
Business & Finance

August 16, 2018 · about 8 years ago

VBA Begins Work on £13.3 Million Trent Flood Defenses

Work has begun on a £13.3 million project which will protect villages on both sides of the river Trent in North Lincolnshire. The scheme, located in Scunthorpe, was awarded to VBA, a joint venture comprising VolkerStevin, Boskalis Westminster and SNC-Lavalin’s Atkins business. Nick Culshaw, operatio

1 minutes read
  • LinkedIn
  • X
  • Email

Work has begun on a £13.3 million project which will protect villages on both sides of the river Trent in North Lincolnshire.

The scheme, located in Scunthorpe, was awarded to VBA, a joint venture comprising VolkerStevin, Boskalis Westminster and SNC-Lavalin’s Atkins business.

Nick Culshaw, operations director at VBA , said: “ This flood defense project will protect people’s home from flooding and protect new developments and businesses .”

Cllr Rob Waltham, the Leader of North Lincolnshire Council , said: “ Thanks to government funding, this extensive flood defense scheme will not only protect our existing communities of Burringham, it will pave the way for future development and provide protection for the six new Trentside villages as part of Lincolnshire Lakes.”

The defense scheme will see 3.8km of sheet piles installed along the east bank of the river from Keadby bridge down to the M180 bridge. The extensive flood defense will provide significant protection to the villages of Burringham Gunness and East Butterwick.

The sheet piles will be topped off with a concrete capping beam to complete the defense level. Additional protection to the existing river bank will also be installed to reduce erosion.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dredging work underway near Lancelin jetty
  2. 2Dredging begins at Double Creek Channel entrance
  3. 3Work on Grand Isle shoreline breakwaters in full swing
  4. 4Shapiro: $837M investment supports largest expansion in PhilaPort’s history

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free