DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Conducts Post-Hurricane Florence Survey of the Myrtle Beach
Business & Finance

September 18, 2018 · about 8 years ago

USACE Conducts Post-Hurricane Florence Survey of the Myrtle Beach

The U.S. Army Corps of Engineers, Charleston District, is conducting surveys of Myrtle Beach to determine if there was any sand loss or movement from the Florence. In order to run the post-Hurricane survey of the Myrtle Beach Storm Damage Reduction project USACE decided to use the state-of-the-art R

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Charleston District, is conducting surveys of Myrtle Beach to determine if there was any sand loss or movement from the Florence.

In order to run the post-Hurricane survey of the Myrtle Beach Storm Damage Reduction project USACE decided to use the state-of-the-art RAMbLr (Rapid Assessment Mobile LiDAR).

According to the Corps, the RAMbLr is an ATV with a LiDAR (Light Detection and Ranging) system attached to it that allows USACE to survey the beach more efficiently and effectively.

Following the survey, in-house engineers will compare the topographic maps to see if Hurricane Florence washed away any sand from the Folly Beach Renourishment project.

“ We hope to have the project going again at the beginning of next week ,” the Corps announced.

This $34.8 million contract for the Myrtle Beach Storm Damage Reduction Project was awarded to Great Lakes Dredge and Dock Company, LLC. During the project, the contractor will pump approximately 1.4 million cubic yards of material on Myrtle, North Myrtle, Garden City and Surfside Beaches.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  2. 2Stockton closes boat launch due to dredging work
  3. 3E-touch Dredgers: Work on new TSHD progresses steadily
  4. 4USACE begins Lower Charleston Harbor maintenance dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free