DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Lena Basin Administration Takes Delivery of New Dredger
Business & Finance

September 19, 2018 · about 8 years ago

Lena Basin Administration Takes Delivery of New Dredger

The new dredger Vladimir Panchenko, built under the federal program “Development of Russia’s Transport System in 2010-2020” for the Administration of Lena Basin, has been put into operation in Yakutia, reports press center of Federal Marine and River Transport Agency (Rosmorrechflot). The dredger of

1 minutes read
  • LinkedIn
  • X
  • Email

The new dredger Vladimir Panchenko, built under the federal program “ Development of Russia’s Transport System in 2010-2020 ” for the Administration of Lena Basin, has been put into operation in Yakutia, reports press center of Federal Marine and River Transport Agency (Rosmorrechflot).

The dredger of Project RDB66.42 with a capacity of 1,000 cbm/h, RRR class «X О2.0 (ice 40) А has been built by PAO Shipbuilding – Ship Repair Corporation (Gorodets, Nizhny Novgorod region).

Under the agreement, the contractor transported the dredger to the Republic of Sakha (Yakutia) and held the control test when delivering the vessel to its operator, Lena Basin Administration.

The dredger arrived in Yakutia on 29 August 2018. Upon completion of inspections, the vessel’s equipment was put to the test, including performance of dredging systems. The acceptance/delivery certificate was signed on 14 September 2018.

Upon completion of the commissioning procedure, the dredger crew prepared the vessel for the cold lay-up as the navigation season has closed.

According to the statement, involvement of the Vladimir Panchenko dredger at the bottleneck of the Lower Yana River will ensure the guaranteed navigable pass on the Yana.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free