DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mouse River Flood Protection Project Moves Ahead
Business & Finance

October 21, 2018 · about 7 years ago

Mouse River Flood Protection Project Moves Ahead

A ton of work – around 23,000 tons – is being done on the MI-1 4th Avenue phase of the Mouse River flood protection project in City of Minot, ND, in the form of rip rap, according to the latest project update. Rip rap is the big rocks that are being placed along the banks […]

1 minutes read
  • LinkedIn
  • X
  • Email

A ton of work – around 23,000 tons – is being done on the MI-1 4th Avenue phase of the Mouse River flood protection project in City of Minot, ND, in the form of rip rap, according to the latest project update .

Rip rap is the big rocks that are being placed along the banks of the Mouse River to prevent it from eroding, to keep it stable during high and low waters.

The contractor – Park Construction – has reached about 65%-70% completion on the total placement of the rip rap. Once winter settles in, they will finish the job next year.

The placement of the rock is being done primarily by a long reach excavator.

The Mouse River Enhanced Flood Protection Project began in 2011 and will reduce the risk of future flooding throughout the entire Mouse River Basin.

In the seven years since its inception, the project has created a Preliminary Engineering Report, a number of associated alternatives studies, project scaling, implementation plans, funding planning and acquisition, and progressed several phases through design and into construction.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free