Advertisement

Business & Finance

about 7 years ago

VIDEO: Half Tide Tug Repair Work Wraps Up

The North Queensland Bulk Ports Corporation (NQBP) has successfully completed repair and maintenance work on the public boat ramp and floating walkway at Half Tide Tug Harbor in Hay Point. The harbor includes a public boat ramp and a floating walkway for recreational vessels up to 7.5m in length. At

1 minutes read

The North Queensland Bulk Ports Corporation (NQBP) has successfully completed repair and maintenance work on the public boat ramp and floating walkway at Half Tide Tug Harbor in Hay Point.

The harbor includes a public boat ramp and a floating walkway for recreational vessels up to 7.5m in length.

At high tide, the 2.4m wide and 40m long walkway can accommodate up to six vessels and can be accessed from both sides.

Funding for the walkway, completed in June 2018, was provided by Transport and Main Roads Marine Infrastructure Investment Program.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.