DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kennebec River Dredging Plan Unveiled
Business & Finance

August 6, 2019 · about 7 years ago

Kennebec River Dredging Plan Unveiled

Bath Iron Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with maintenance dredging in the Kennebec River in Bath, Maine. According to the USACE’s latest release, Bath Iron Works is seeking to renew a previou

1 minutes read
  • LinkedIn
  • X
  • Email

Bath Iron Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with maintenance dredging in the Kennebec River in Bath, Maine.

According to the USACE’s latest release, Bath Iron Works is seeking to renew a previous 10-year permit to conduct periodic maintenance dredging activities associated with its shipbuilding operations in the Kennebec River in Bath.

“Corps permit NAE-2007-02528, issued Nov. 5, 2009, authorized Bath Iron Works to dredge up to 70,000 cubic yards at their dry dock sinking basin; up to 4,000 cubic yards at their dry dock landing grid; and up to 12,000 cubic yards at berthing piers 1, 2 and 3. Dredged material from the sinking basin has been disposed of downstream, at an in­river site just south of Bath at Bluff Head. Dredged material from the other sites has been disposed of at an upland, non-wetland location. This permit expires on Dec. 31, 2019,” said USACE in its announcement.

Dredge volumes are expected to remain the same on average but actual quantities for individual dredge events may vary depending on the frequency and degree of shoaling.

The first maintenance dredging event is proposed to occur during the winter of 2019/2020 (dry dock sinking basin, Pier 2, and the dry dock landing grid).

The deadline for submitting the comments on this dredging plan is September 5, 2019.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free