DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›H&L Contracting Nets Hampton Harbor Dredging Project
Business & Finance

October 13, 2019 · about 6 years ago

H&L Contracting Nets Hampton Harbor Dredging Project

H&L Contracting, LLC of Bay Shore, NY, has won a $4.4 million maintenance dredging contract for the Hampton Harbor project in New Hampshire. According to the Army Corps, dredging and disposal operations are anticipated to take about 4 to 5 months to complete and will occur between Oct. 15, 2019 and

1 minutes read
  • LinkedIn
  • X
  • Email

H&L Contracting, LLC of Bay Shore, NY, has won a $4.4 million maintenance dredging contract for the Hampton Harbor project in New Hampshire.

According to the Army Corps, dredging and disposal operations are anticipated to take about 4 to 5 months to complete and will occur between Oct. 15, 2019 and March 1, 2020.

During the project, approximately 150,000 cubic yards (CY) of sandy material will be hydraulically dredged from the 8-ft channel, and three 6-ft anchorages at the mouth of the river and material pumped onto adjacent beaches in Hampton and Seabrook, NH.

This work will allow project users to maintain safe navigation in Hampton Harbor. Natural shoaling processes have reduced available depths to as little as 1.0 foot in the 8-foot MLLW channel in Seabrook and 8-foot MLLW anchorage in Hampton, as little as 2.5 feet in the 8-foot Seabrook Anchorage, and approximately 4.0 feet in the 8-foot MLLW cross channel, 6-foot MLLW Hampton Anchorage and 6-foot state of New Hampshire Anchorage making navigation hazardous or impossible at lower stages of the tide.

An optional bid item is included in the contract to hydraulically dredge approximately 2,500 cubic yards of sandy material from the state anchorage in Hampton with placement on Hampton State Beach.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free