Advertisement

Business & Finance

about 7 years ago

Bumper Season for Dredge Hurley

The U.S. Army Corps of Engineers, Memphis District’s Dredge Hurley has returned to its home port of Ensley Engineer Yard in Memphis Harbor. According to the Corps, the arrival of Dredge Hurley marks the end of the two most productive dredging seasons in the vessel’s history. Memphis District Command

1 minutes read

The U.S. Army Corps of Engineers, Memphis District’s Dredge Hurley has returned to its home port of Ensley Engineer Yard in Memphis Harbor.

According to the Corps, the arrival of Dredge Hurley marks the end of the two most productive dredging seasons in the vessel’s history.

Memphis District Commander Col. Zachary Miller and other district officials were on hand on Monday, Dec. 9, to welcome the crew back after a deployment on the Lower Mississippi River of more than six months.

Col. Miller said that the Hurley dredged more than 12.5 million cubic yards of material from the river this year, ensuring safe navigation for commercial traffic.

For the record, 12.5 million cubic yards is equivalent to the capacity of about 3,788 Olympic-size swimming pools.

The Hurley will remain in Memphis over the winter for upkeep and maintenance before beginning another dredging season next year.

Advertisement

The Hurley is a 353-feet-long self-propelled dustpan dredge built for the Army Corps in 1993. It can dredge to a depth of 75 feet and discharges material outside the navigation channel through a 32-inch diameter pipeline.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.